Yamal LNG project. Vacancies at Yamal LNG

general characteristics

Yamal LNG is the second liquefied gas production plant in Russia, with a capacity of 16.5 million tons per year. Construction will take place in three stages of 5.5 million tons each. The deadline for putting the first line of the plant into commercial operation was shifted from 2016 to 2017. By this time, the development and the necessary volume of drilling to put the field into operation should be completed, a port should be built and an icebreaker-class tanker fleet should be formed. However, due to the difficult economic situation in the country that developed towards the end of 2014, as well as foreign policy problems, the timing of the Yamal LNG project is being shifted again. In particular, Total stated that it no longer expects to start production in 2017.

As of February 2015, the construction of Yamal LNG facilities has been completed by 20-25%, orders have been placed for equipment with long lead times, including cryogenic heat exchangers, gas turbines, compressors for liquefaction lines; 22 production wells have been drilled, more than 3,100 construction workers are already working on the sites. The site for the construction of the plant has been prepared, the construction of a pile foundation for LNG tanks has begun, and the construction of a seaport is at an advanced stage. In December 2014, the first passenger plane landed at Sabetta Airport. Upon completion, the airport will be able to accommodate all types of aircraft, including cargo aircraft.

In November 2013, NOVATEK announced the possibility of expanding the Yamal LNG project to 25-30 million tons per year using the reserves of the peninsula. The resource base for expanding the project could be the reserves of the Salmanovskoye (Utrenneye) and Geofizicheskoye fields.

As part of the project, the main tenders were held and key contracts were concluded:

  • In April 2013, Yamal LNG OJSC, following a tender, signed an agreement with the consortium Technip (France) and JGC Corp. (Japan) for the design, supply of equipment, materials and components, construction and commissioning (EPC contract) of a complex for the treatment and liquefaction of natural gas based on the South Tambeyskoye field.
  • In September 2013, Yamal LNG OJSC entered into a contract with the German Siemens for the supply of key elements of a thermal power plant, which will supply Yamal LNG with electricity and heat. Siemens' responsibilities include the manufacture, testing, delivery, installation and commissioning of eight gas turbines and other equipment.
  • In October 2013, Yamgaz SNC, a joint venture between Technip and JGC, selected the American General Electric as the supplier of the main turbocompressor equipment for three trains of the LNG plant.
  • In January 2014, Yamgaz SNC signed an agreement with the French Vinci for the construction of four LNG storage facilities with a capacity of 160 thousand cubic meters. meters each.
  • In January 2014, Yamgaz SNC entered into a contract with the Japanese Yokogawa Electric for the supply of integrated control and safety systems (ICSS) for the Yamal LNG project.
  • In July 2014, Yamgaz SNC entered into a contract with the Chinese Offshore Oil Engineering Co. (COOEC) for the manufacture of key gas liquefaction equipment worth $1.623 billion.

There are two main reasons for bringing the project to life in Yamal:

  1. Availability of huge resources. The resource base for the plant is the Yuzhno-Tambeyskoye field (reserves 1.3 trillion cubic meters), as well as the right to use the subsoil of four more areas granted to NOVATEK by a government decision in August 2011, which should increase the resource base for the plant to 4 .5 trillion cubic meters of gas. These are the Geophysical and Salmanovskoye fields (on the territory of the Gydan Peninsula), as well as the North Ob and East Tambey areas (the water area of ​​the northern part of the Ob Bay).
  2. Project logistics. The unique location of Yamal makes it possible to create a flexible, competitive logistics model that ensures year-round supplies of LNG to the markets of Europe and North America, as well as direct supplies to the Asia-Pacific region via the Northern Sea Route. Total plans to supply Russian LNG from the Yamal Peninsula to the UK and Europe. Exactly how much gas will be sold on the European market and to which companies will become clear over the next few months.


Shareholders

Yamal LNG is the largest LNG production project in Yamal, implemented by the Russian independent gas producer - NOVATEK OJSC. In June 2009, the company acquired a stake in OAO Yamal LNG (51%), and in September 2011, NOVATEK’s share was increased to 100%. In October of the same year, 20% of Yamal LNG was acquired by Total, which became NOVATEK’s strategic partner in the project. In January 2014, a newcomer appeared among the shareholders of the Yamal LNG project. NOVATEK and the Chinese CNPC have closed the purchase and sale transaction of a 20% stake in the Yamal LNG project. After the transaction, shareholders' shares are distributed as follows.


Source: Vesti.Finance, September 19, 2014.

But NOVATEK continues to search for partners who can get another 9% of Yamal LNG. Among the contenders were Chinese, Japanese and Indian companies. However, US sanctions against the company have negatively impacted the prospects for these negotiations. Japanese companies and the Indian oil and gas concern ONGC refused to acquire a stake in Yamal LNG. Now, according to some reports, NOVATEK is thinking about attracting a purely financial investor, which in the current conditions could be a Russian-Chinese investment fund or Gazprombank, which was already interested in a share in the project.

On the night of October 21, the head of Total, Christophe de Margerie, died in a plane crash at Moscow's Vnukovo airport. According to the decision of the company's administration, until 2015, two people will de facto manage the company: Patrick Pouyanné was appointed executive director, and Thierry Desmarais, who had previously been the general director and president of the administrative board of the company, took the post of chairman of the board of directors of Total.

Already at the end of November, the new head of Total, Patrick Pouyanné, confirmed the company’s intentions to cooperate with Russia in the Yamal LNG project.

Investments

Details of the economics of the project are not advertised. Initially, NOVATEK estimated investments in Yamal LNG at $20 billion, but in December 2013 a final investment decision was made on the project and the estimate increased to $26.9 billion.

In May 2014, the China Development Banking Corporation, Vnesheconombank, Gazprombank and Yamal LNG signed a memorandum on organizing financing for the construction of an LNG plant. The Chinese company will act as a general coordinator of interaction with Chinese financial institutions and “will do everything possible” to attract financing from Chinese banks for a period of up to 15 years. Chinese banks are capable of providing about $20 billion to the Yamal LNG project. However, as of today, there are no specific agreements.

So far, Yamal LNG has not guaranteed itself to attract sufficient funds for investment. The project should be 30-40% financed by shareholders, and the remaining amount will be raised through project financing. Shareholders - NOVATEK, Total and CNPC - by mid-2014 had invested 45.2 billion, 31.9 billion and 42.2 billion rubles. respectively. The shareholders agreed on disproportionate financing, and until a certain amount of investment is reached, NOVATEK will proportionally invest several times less than other project participants. In the first half of 2014, 64.4 billion rubles were invested, of which 65.5% came from CNPC, while NOVATEK’s contribution was only 2%. The level at which funding becomes proportional may be reached by the end of 2015.

So far, the project is financed only by shareholders, but these funds are not enough to cover all costs, and the attraction of project financing has not been completed due to sanctions against NOVATEK. The company has agreed to receive $2.3 billion from the SWF and is in talks to receive about $10 billion from Chinese banks, hoping to complete them by mid-year.

The total investment in Yamal LNG is estimated at a trillion rubles (this includes investments in field development, construction of a plant, construction of the Sabetta port, fleet and building logistics along the entire Northern Sea Route). According to official statements, the government intends to take a direct part in the creation of a new northern transport infrastructure. In particular, the total amount of financing for the Yamal LNG project is 97.2 billion rubles. Of these, 71.2 billion rubles were allocated by the government of the country, and 26 billion rubles from extra-budgetary sources. The funds allocated by the government will be used for the construction of seaport facilities near the village of Sabetta and the creation of a shipping access canal in the Gulf of Ob for the transportation of LNG.

The volume of capital investments in the project until 2018 will be: 717.2 billion rubles (53.6% of the total financing) of borrowed funds, 407.3 billion (32%) - funds of participants in the investment project; 150 billion (11.8%) - funds from the National Welfare Fund.

Thanks to the provision of tax preferences, the profitability of the project will be ensured. In particular, it has a zero mineral extraction tax and an export duty. The authorities of the Yamal-Nenets Autonomous Okrug, in turn, zeroed out the property tax for organizations carrying out a unified technological cycle of LNG extraction and production in the territory of the district, and reduced their profit tax. In addition, in February 2015, Prime Minister Dmitry Medvedev signed a decree according to which equipment for the Yamal LNG project plant was included in the list of imported products exempt from VAT.

Technologies

The plant is considered a unique energy project in terms of its complexity, since it will be built in harsh climatic conditions. Its implementation requires advanced but proven technologies, including BASF's developments in natural gas purification, Total's innovations in gas liquefaction, storage and transportation, as well as the latest technologies to ensure efficient and environmentally friendly well construction. For example, in January 2013, at Uralmashzavod, production of the newest drilling rig called “Arktika” was completed, which will be used to work at the South Tambeyskoye field. Also, American Air Products & Chemicals will supply three cryogenic heat exchangers that will be used in gas liquefaction processes using mixed pre-cooling refrigerant. In October 2014, Yamgaz SNC entered into a contract with the Philippine The Atlantic Gulf & Pacific Company (AG&P) for the supply of technological modules for Yamal LNG.

Transportation

NOVATEK has decided that there will be no pipeline supplies of gas, and the bet will be placed on the prospects of the Northern Sea Route. Back in 2011, when the Northern Sea Route’s load was 120 thousand tons, NOVATEK’s first large transit tanker was carried along this transport route. Today, the volume of cargo transit along the NSR has already increased to 2 million tons, which indicates an increase in the intensity of use of this route. Now the domestic gas producer is working out the most optimal routes for the movement of large-tonnage tankers along the Northern Sea Route, in particular, north of the New Siberian Islands.

In the summer, LNG will travel along the Northern Sea Route to Asian countries. At the same time, gas will be supplied to the European market only in winter, since the Northern Sea Route is completely covered with ice. And its transportation to Asia will become impossible.

  • As part of the Yamal LNG project, by 2017 it is planned to build 10 icebreakers for transporting liquefied gas, which will become the largest ships built specifically for Arctic conditions. The length of the ships will be 300 meters, power – 40-42 MW, width – 50 meters, capacity – 180 thousand tons. The gas carriers were designed by the Finnish design bureau Aker Arctic.
  • At the Baltic plant, specifically for the implementation of the Yamal LNG project, they began to build a unique nuclear icebreaker - the largest and most powerful in the world. This is the first and lead ship of a new series of icebreakers. In total, it is planned to build three icebreakers of this class.
  • Plans have been announced to build 16 ARC7 class LNG tankers to transport LNG from the port of Sabetta to world markets. They will be built by South Korean Daewoo Shipbuilding & Marine Engineering.
  • In March 2014, as part of a contract dated July 2013, Sovcomflot ordered Daewoo to build the first icebreaking LNG tanker.
  • In April 2014, it became known that Yamal LNG had formed a list of likely contenders among shipping companies that would transport LNG. The list includes Sovcomflot, Japanese Mitsui OSK and Canadian Teekay LNG.

Sabetta seaport

Construction of the Sabetta seaport began in July 2012. In addition to the export of liquefied gas, the development of the port may provide additional opportunities for the development of new fields in Yamal and the Gulf of Ob. Thus, Sabetta is the main infrastructure component of the project, as well as the only large facility whose construction costs are covered by the federal government, which considers Sabetta as a multi-purpose port for the development of Yamal and the Northern Sea Route (the total investment in the port is 900 billion rubles). . The federal budget allocates 47.3 billion rubles for the construction of the port. In June 2014, it became known that the construction of the Sabetta port had increased in price by 22 billion, to 69.6 billion rubles.

To date, the design of the port has already been completed. As of early October 2013, Yamal LNG received all environmental and expert government approvals for project documentation. Now active construction work is underway there and according to forecasts, the deadline for the completion of the project will not be violated. It is important that dredging work continues, leading to environmental risks. To restore the damage to the fish population in Yamal, it is planned to build a plant for growing juvenile sturgeon and whitefish.

LNG export right

As of September 2014, 98% of future LNG has already been contracted. The trading companies of NOVATEK and Total - Novatek Gas & Power and Total Gas & Power - plan to supply LNG mainly to the markets of the Asia-Pacific region. Yamal LNG has agreed to sell LNG to Spanish Gas Natural (2.5 million tons per year), CNPC (3 million), Total (4 million), Novatek Gas & Power (2.86 million) and Gazprom Marketing & Trading (3 million).
At the end of May 2014, NOVATEK announced the latest major deal to date for the sale of LNG from Yamal, within which Gazprom contracted 3 million tons per year.
In September 2014, it became known that NOVATEK had reserved 5% of the gas from the Yamal LNG project for sale on the free market outside of long-term contracts. In absolute figures we are talking about 820 thousand tons of LNG per year. Taking into account the sale of 5% on the spot, the share of contracted LNG now amounts to more than 98% of the plant’s design capacity. Thus, the company did not leave volumes for a potential buyer of 9% in the project.

In addition, from December 1, 2013, Gazprom lost its export monopoly on liquefied natural gas. Yamal LNG, as well as the LNG plants of Rosneft and Gazprom itself, received the right to export. Now companies will be able to independently and almost without restrictions choose where, to whom and how much to sell LNG.

In September 2014, NOVATEK received a license to export LNG.

Sanctions

In July 2014, NOVATEK, as well as VEB and Gazprombank, fell under US sanctions. They are prohibited from taking loans from American banks for periods exceeding 90 days. Since March, US sanctions have also been in effect against Gennady Timchenko. His share in NOVATEK is 23.49% (through Volga Group, data as of the end of 2012).

Today the situation is like this. NOVATEK itself is not going to change its plans, including with regard to the Yamal LNG project. In turn, Total states that, despite the sanctions, it does not intend to stop cooperation on the implementation of Yamal LNG, while emphasizing that given Europe’s dependence on Russian gas, it would be quite risky to slow down work on the project.

However, here we note the following problem. The fact that NOVATEK was included in the sanctions list significantly reduces the company’s ability to raise funds for the development of the project. Thus, Total clearly determined that it would participate in the project, but its ability to finance its share through European and American banks was significantly limited. In October 2014, it became known that Yamal LNG shareholders had adjusted the financial plan for the project due to sanctions, but the project itself was being implemented according to plan.

The developers of Yamal LNG are already experiencing problems with financing. However, NOVATEK is trying to overcome its financial difficulties with the help of the state. In September 2014, NOVATEK submitted an application to receive 100 billion rubles from the National Welfare Fund for Yamal LNG, and after 5 months - in February 2015 - at a meeting on economic issues held by the President of Russia, it was decided to allocate funds for the project National Welfare Fund in the amount of 150 billion rubles. These funds are invested in Yamal LNG bonds in two tranches of 75 billion rubles each.

However, according to some reports, the plant was already experiencing inconvenience with contractors who were supposed to supply vital components for the gas liquefaction plant. These problems are directly related to sanctions.

Of the top industrial places where I would really, really like to go, or my so-called industrial shortlist-10, Yamal LNG has always been in the forefront, and now my dream is already a reality, I on the Yamal Peninsula above the Arctic Circle in Sabetta.

The Yamal LNG project is a whole complex that includes own resource base based on the South Tambeyskoye field, a number of production facilities, infrastructure component, including the Arctic port (plus a transshipment base will be created in Belgium in the city of Zeebrugge for gas deliveryduring periods of lack of navigation along the Northern Sea Route) and a modern airport to boot. The construction of the unique plant is taking place in the difficult climatic conditions of the Arctic; the entire infrastructure was created practically from scratch, and already in 2017 the first stage of the gas liquefaction plant with a capacity of 5.5 million tons per year will be launched. At the moment, the overall readiness for the entire project is somewhere around 51.3%, and the readiness for the first stage is 64.4%. So, friends, today we have another exclusive.

3. This is what the construction site of a gas liquefaction plant looks like now

Liquefied natural gas or LNG for short, as it is commonly called in the professional environment (English Liquefied Natural Gas, abbreviated LNG) is ordinary natural gas (mainly methane, CH4 by 95%, plus ethane, propane, butane, nitrogen, which account for the remaining 5%), cooled to a temperature of –162°C (the so-called liquefaction temperature) for ease of storage and transportation in liquid form. LNG is an odorless and colorless liquid whose density is half that of water. It is non-toxic and non-flammable. When regasification (returning gas to its original vapor state), about 600 cubic meters of ordinary natural gas are formed from one cubic meter of liquefied gas.

The first experimental liquefied natural gas plant was built back in 1912, and in 1941 its large-scale production was established for the first time in Cleveland, Ohio (USA). In Russia, the first such plant was built in 2006 in the village of Prigorodnoye in the south of Sakhalin. Its capacity is 9.6 million tons of LNG. The operator of the Sakhalin-2 project is Sakhalin Energy (the main shareholders are Gazprom Sakhalin Holdings B.V. (100% subsidiary of PJSC Gazprom) - 50% plus one share, Shell Sakhalin Holdings B.V. - 27.5%, Mitsui Sakhalin Holdings B.V. - 12, 5% and Diamond Gas Sakhalin B.V. – 10%). So, our YamalLNG Plant will be second on this list. When asked about competition, the answer was that we are not competitors, already about 96% of LNG is chartered by clients on a long-term basis, mainly for supplies to countries Asia-Pacific region (APR).

The South Tambey gas condensate field was discovered in 1974. Its proven and probable reserves according to PRMS standards as of December 31, 2014 amount to 926 billion cubic meters. m. of gas. The development license was issued until 2045 and belongs to OJSC Yamal LNG. There are plans to drill 208 production wells with horizontal completion at 19 well pads. Already (as of May 1, 2016) the drilling of 50 production wells has been completed, and this is 86% of those required to launch the first stage of the LNG Plant. The Arktika and Aurora drilling rigs manufactured by Uralmash (Ekaterenburg) operate at the fields.

The gas liquefaction plant will consist of three gas liquefaction lines with a capacity of 5.5 million tons per year each, i.e. the total capacity will be 16.5 million tons. As I said above, the first stage will be launched in 2017, the next in 2018 and 2019, respectively. Now 100% of the foundations of the first stage have already been prepared, and the main equipment (including a cryogenic heat exchanger) has been delivered.

The share capital in OJSC Yamal LNG is distributed as follows: our controlling shareholder is NOVATEK, 20% went to the French in the person of Total, the Chinese also did not miss their luck, CNPC owns 20%, and the Chinese Silk Road Fund (SRF) - 9.9%.

Some interesting statistics. The total weight of the Yamal LNG plant is 650 thousand tons. Of these, 500 thousand tons are technological modules, and 150 thousand tons are overpasses. The entire plant will consist of 360 modules, of which there will be 111 technological modules. In 2015, 7 modules were delivered, thereby checking the logistics chain; in 2016, they plan to deliver 79 modules to the site, which will make it possible to launch the first stage.

As for the technological process itself. The hydrocarbon mixture from the wells will be supplied via gas collection to a single integrated complex for the preparation and liquefaction of natural gas. Where will the separation first take place, i.e. separation of mechanical impurities, water, methanol and condensate from gas. After which, the separated gas will be supplied to liquefaction lines and subsequently undergo purification from acid gases and traces of methanol, drying and removal of mercury, extraction of ethane, propane and heavier hydrocarbon fractions. The already purified gas is then sent for pre-cooling and liquefaction. And then the LNG is supplied for storage into special closed-type isothermal tanks.

14. The first technological line is blooming behind me

16. Future LPG storage tanks

17. We were very lucky, we were allowed inside, in a few weeks it will be brewed and everyone else missed their chance.

22. As we see, there will be four of them (4x160,000 m3). The overall readiness of the tanks is currently 75.3%. The first two will be fully ready by November 2016.

29. The power plant will be equipped with eight SGT-800 gas turbine units (Siemens) with a capacity of 47 MW each and four heat recovery modules (UTO-40) produced by the same Siemens company, with a nominal thermal power of 40 MW each.

36. At the moment, the overall readiness of the Yamal LNG GTPP is 60.2%. The installation of gas turbine units (GTU) 1-4 has already been completed. The launch of the first stage is scheduled for this year. JSC VO Technopromexport is responsible for the construction.

37. And so that the weather would not interfere with the construction site, luxurious production and assembly shops were built here.

So, what is so good about Yamal LNG? Firstly, the plant itself is located right on the South Tambeyskoye field, and its reserves are amazing.

Secondly, mining here is significantly cheaper, since Mother Nature herself helps us. Yes, the climate here is harsh, of course, in most of Russia there is already a big plus in temperature, but here on May 5, when I actually arrived here, it was minus 10. And in winter, more than 40 is the norm, but in summer you can sunbathe a little, but it goes away quickly . And under these conditions, due to the low average annual temperature, less specific energy is required for gas liquefaction, which allows achieving higher volumes of LNG production compared to similar projects located in southern latitudes.

R. S. Dear owners and shareholders, representatives of company press services, marketing departments and other interested parties, if your company has something to show - “How it’s done and why it’s done this way!”, we are always happy to take part. Feel free to write to us yourself[email protected] and tell us about yourself by inviting us to visit YOU. Take an example from the leaders!

More than 150 organizations have already opened their doors to us, and here are our reports from there:

Why our industry is the best in the world: http://zavodfoto.livejournal.com/4701859.html

ZAVODFOTO - Walking around the country! - RUSSIAN ENERGY SECTOR: http://zavodfoto.livejournal.com/2133307.html

“Perm region - We have something to be proud of!”: http://zavodfoto.livejournal.com/1823939.html

We are always happy to make new friends, add us and read us at:

I read the material of the respected Brekotin today .

As always, there are citizens for whom the construction of a new Russian enterprise is like a knife to the heart.

And Russia doesn’t need construction, and the investments are wrong, and the workers are wrong, and the equipment is wrong, and the buyers are bastards, everything, without a doubt. Well, God is their judge. This is their fate - to criticize, sitting in a warm apartment, without lifting their butts from the sagging sofa.

And for normal people, I suggest you look: what is Yamal LNG- In fact. So: look and rejoice for our heroic builders and the capabilities of Russian industry.

The whole truth about Yamal LNG

I was again drawn to the north, far, far away, beyond the Arctic Circle, to the Yamal Peninsula in Sabetta, where one of the largest projects in the oil and gas sector in recent years is being implemented - Yamal LNG. To understand, $22 billion has already been invested in it (a total of about $27 billion is planned). The liquefied natural gas (LNG) plant itself will operate on the resource base of the South Tambeyskoye field, and its capacity will be 16.5 million tons per year. Last May I was already in these parts http://zavodfoto.livejournal.com/4827701.html, then the overall readiness for the entire project was about 51.3%, and the readiness for the first stage was 64.4%. How things are today, I will show and tell you everything, fortunately the company PJSC NOVATEK, a shareholder of the project, is very open in this matter and is not afraid of me :).

2. Experienced a moment of deja vu. The speaker this time was Dmitry Monakov, already familiar to me, the first deputy director of the project.

3. And straight to the numbers. At the moment, the overall readiness for the entire project is 77-78%, and for the first stage of the plant it is already 88%. This is, in fact, what the first phase should look like by the end of the year.

The South Tambeyskoye field is located in the North-East of the Yamal Peninsula and belongs to the West Siberian oil and gas province. It was opened back in 1974. The field consists of 5 shallow gas formations and 37 deep gas condensate formations. The depth of the deposits varies from 900 to 2850 m. The dimensions of the deposit from south to north are about 70 km and from east to west - about 30-35 km. In total, they plan to drill 208 production wells with a horizontal end at 19 well pads at the field (the required 58 wells have already been drilled for the first stage, and a total of 78 have already been drilled at the moment. At the same time, only 35 wells are needed for the second stage, and about 35 for the third stage as well -38. The rest will have to maintain the necessary flow rate for the full operation of the plant). Proven and probable reserves amount to about 1.3 trillion cubic meters of gas and 60 million tons of condensate. The license to develop the field belongs to the Yamal LNG company and is valid until 2045. This resource base should be enough for at least 25-30 years of confident work.

The Yamal LNG plant will consist of three gas liquefaction trains with a capacity of 5.5 million tons per year each, i.e. the total capacity will be 16.5 million tons. In addition, the production complex will include liquefied hydrocarbon gas fractionation units, stable condensate and refrigerant storage parks, as well as other general plant engineering systems and flare units.

The entire plant will be built from 360 modules, of which there will be 111 technological modules. The first such module was delivered to the construction site on September 21, 2015. This core equipment is produced in 7 Chinese and 3 Indonesian shipyards. The total weight of the LNG plant is 650 thousand tons, of which 150 thousand tons are racks, and 500 thousand tons are the process modules themselves.

In the fall of 2016, all 78 modules required for the first stage, including the central control room, were delivered to Sabetta. Nevertheless, there are still 57 modules left to be delivered to the plant’s territory (for the second and third stages), which will appear here according to plan before the end of 2017.

8. On this day it was minus 30 here, and there was still a very strong wind at the altitude, but how could this stop me, who is in love with our industry? Therefore, almost blindly, since all my glasses are fogged up and frozen, I conquer and conquer all the lush heights of the plant :-)

9. Yes, well, in a year we’ve done a lot of business here, we’ve built a lot of things, well done, keep it up, we’ve definitely surprised!

11. We didn’t feel shy, we walked around inside...

The start of LNG production on the first line is planned for 2017, while the first deliveries of liquefied natural gas from here should take place before the end of this year.

16.Tanks for storing liquefied gas, there are four of them in total (4x160,000 m3). In permafrost conditions, each tank is built on a foundation of 948 piles, each 24 meters deep, with a thermal stabilizer installed next to each. In 2016, all of them were built and passed the necessary hydrotests. The main platforms of pumping equipment are installed on the first two tanks.

18. We climbed to one of the reservoirs. Their height is 54 meters. By the way, last year I was inside it, but now the way there is already closed.

20. An important component of the project is its own generation. A new gas turbine power plant with a capacity of 376 MW will be built here, the thermal power plant will be 160.0 MW. You see, on the right you can see an orange, blue and white building with pipes, that’s it. The first gas turbine with a capacity of 47 MW should be launched this spring. Thus, it will create the energy foundation for launching the first stage of the plant. It’s no secret that I’m partial to energy, so I’ll write a separate post about it.

As for the production process, it can be briefly described as follows. From the wells, gas is transported to the plant through a pipeline system. They are above ground here. When the gas enters the LNG plant, it is lightly conditioned to ensure the best possible liquefaction process. To do this, condensate is separated from the gas (these are liquid fractions that are simply dissolved in the gas at formation pressure and are in a state like steam), methanol (used for production, such as lubricant) and other unnecessary impurities. By the way, condensate also remains in use; it goes through a pipeline system into special tanks (there are 3 tanks of 50,000 m3 each for this purpose) and when a special tanker arrives, it is also shipped to consumers. Clean (prepared) ideally dry gas is supplied for liquefaction and then stored in tanks. In addition, in order to obtain a high-quality final product, carbon dioxide and mercury released during the cleaning process are removed.

On November 13, 2016, cryogenic heat exchangers were delivered to Sabbeta for the second and third lines of the plant, but for the first line, a similar heat exchanger has already been installed in the right place. The main cryogenic heat exchanger is considered the “heart” of the LNG plant, because it is inside it that the final cooling of natural gas to a liquid state is carried out. The heat exchanger itself is made of aluminum alloy and consists of several tube bundles wound onto a central core. The total length of the pipes exceeds 43 km.

35. Currently, about 27,500 people work at the construction site.

40. Our next stop is the Arctic sea port, which is also part of the general infrastructure of the plant. I also wrote about him last time: http://zavodfoto.livejournal.com/4838728.html

41. By the way, thanks to Yamal LNG, cargo traffic along the Northern Sea Route has doubled. And in total, more than 10 million tons of cargo have already been delivered to the seaport of Sabetta since 2012.

Another powerful construction project, on which a serious bet is being made both from the point of view of the development of the region, its infrastructure and new jobs, and from the point of view of attracted investments, is the plant in Yamal.

Foreign investors can join the project for the construction of a liquefied gas production plant. At least, Minister Ulyukaev says that negotiations with French banks are moving forward, and the Russian side is full of optimism.

From a four-kilometer depth to the surface. The first cubic meters of natural gas in 40 years. The South Tambeyskoye field, discovered back in the 70s in Yamal, has not been developed all this time due to imperfect technology. The harsh Arctic was taking its toll. But today, Russian-made drilling stations don’t care about 50-degree frosts or permafrost.

About 50 wells have already been drilled, more than 200 are planned, the volume of reserves in the field will last for decades. The blue fuel will immediately go to the gas liquefaction plant, which is being built here, in the northeast of Yamal.

Liquid gas will be stored here at a temperature of minus 165 degrees. Such a tank could easily accommodate several huge transport aircraft. The volume of each of the four tanks is 160,000 cubic meters.

“No one has ever made such reservoirs beyond the Arctic Circle. No country in the world beyond the Arctic Circle has reservoirs, only the Russian Federation!” - said Renat Garifulin, Deputy Head of the Quality Control Department of the Capital Construction Department of Yamal LNG OJSC.

Giant gas tankers will come to collect the finished product. Yamal is also a unique port, so gas will go directly from here to markets: the Asia-Pacific region and Europe. For example, contracts have already been concluded with China, India and Spain for a quarter of a century.

Five years ago there was nothing here. Only ice, snow and permafrost. From the smallest screw to construction equipment and materials for these huge liquefied gas storage tanks, absolutely everything is delivered here by sea. Over the years, six million tons of cargo have passed through the port of Sabetta.

Icebreakers bring cargo ships to the port in tugs, otherwise it is simply impossible to navigate through the almost two-meter ice. But soon all these blocks near the pier may simply disappear. Divers are already working on installing experimental ice protection.

“This system will consist of several pipes that will be pulled from the bottom of the pier with hot water and air. And due to the so-called bubbling, the rise of this warm water to the surface, the freezing of ice on the berth wall will be controlled,” says Valery Vedernikov, chief diving specialist of Yamal LNG OJSC.

Cargo ships go to Sabetta via the Northern Sea Route, mainly from Arkhangelsk. It is here that supplies for the construction of the plant flow from literally all over the country.

Products for the plant are produced in 25 regions of Russia. For example, the Volgograd Petroleum Engineering Plant developed equipment for gas liquefaction. And in Cherepovets, metal structures and pipelines are manufactured. Thanks to this order, a new workshop was built here and the most modern equipment was purchased.

“The order itself is interesting and has brought the team together quite strongly. New specialists have arrived,” says Dmitry Saliy, production manager of Pervy Koksokhimmontazh OJSC.

Entire production buildings and structures of the future plant are also designed and manufactured in Krasnoyarsk. A local technological mechanical engineering enterprise has switched to round-the-clock operation. There is no need to complain; before the Yamal order, the plant had a decline in production.

“We had to hire up to 100 people just to ensure this process. We attracted several schools and institutes that directly trained these specialists according to the target program for us,” said Alexey Semernya, executive director of KrasPTM CJSC.

In the shift camp itself on Yamal, 15,000 people live and work. Dozens of dormitories, canteens, gyms, even its own fire station and police department.

Most of the buildings are prefabricated block structures. They were made in Vologda. For Arctic housing, a unique insulation is used; it was developed specifically for the Yamal project.

“The buildings were designed for a design temperature of minus 65 degrees. We didn’t test it further, but I think that this design can withstand lower temperatures,” said Roman Begunov, lead designer of SKDM JSC.

A dormitory for 300 people can be built in three weeks. Ready-made blocks are supplied to Yamal; they are simply connected to each other like a construction set.

The hostel block is already ready to be sent to Yamal, they are literally handed over turnkey, everything in the premises is almost ready. Doors, windows, fine finishing, even electrical wiring. All that remains is to lay the linoleum and insert the lamps - all this is already included in the kit.

There are direct flights from Moscow and other cities to the rotational village of Sabetta. An international class airport was built here. To build a runway in permafrost conditions, special geosynthetic materials were needed that were not produced in Russia. At first the order was planned to be placed in England. But at one of the Divnogorsk enterprises they mastered new technologies and launched such production. Especially for deliveries to Yamal.

Yamal LNG is a very advanced project. Designers and builders use the most modern solutions. And, in my opinion, this is very important when projects like these bring new materials and new products into our Russian reality, which make it possible to obtain higher quality products at a lower price,” says Andrey Putivsky, CEO of the Techpolymer group of companies.

More orders for Russian enterprises means greater production volumes, which means tax deductions increase. So the plant under construction in Yamal is helping the Russian economy today. Its first production line will start operating next year. Yamal LNG will reach full capacity by 2019.

Shift work at the Yamal LNG project in Sabetta. Its vacancies are posted on the official website. In-demand professions for men and women are driver, technician, mechanic, welder, installer, electrician, commandant, cook, etc. In 2019, Yamal LNG OJSC annually plans to commission one production line of a liquefied gas plant, therefore The question, Yamal LNG - vacancies, is very relevant at the moment.

Shift work and vacancies Yamal LNG in the rotational camp. Feedback from employees about working in the North. How to get a job on Sabetta's shift. Contacts of the HR department of the direct employer. Are there any vacancies for women? Professions: handyman, driver, electrician. Vacancies for YAMAL LNG for shift work for 2019 at Sabetta - an integrated project for the production, liquefaction and supply of natural gas. You can find out how to get a job in a company and what kind of work they offer in the North on the official website. And also on specialized resources for posting vacancies.

Fill out your resume ➤

Contacts of the HR department for employment, telephone number, current vacancies are available on the official website of Yamal LNG http://yamallng.ru/career/open_vacancies/ - select an open vacancy from the list and on this page there will be a button “send a ready-made resume”. The text and vacancies posted below are for informational purposes only.

Work on Yamal LNG on a rotational basis

The company pursues personnel and social policies in compliance with the strictest and highest international standards. Yamal LNG – vacancies for representatives of various specialties; workers from different countries take part in the implementation of the project.

Fill out your resume ➤

In addition to the construction of the plant, a modern airport for international traffic and a seaport, as well as other transport infrastructure facilities, are being built. The construction of the plant is carried out in several stages, the launch of which is planned in 2019-2019. Up to 16 million tons of LNG will be supplied annually to European and Asia-Pacific countries; in addition, up to 1.2 million tons of gas condensate will be sold.

Working conditions in Yamal LNG are constantly improving, so they are safe and comfortable, all workers are provided with a full social package, medical insurance, and there is the opportunity to take advantage of health resorts. The company is actively developing, so there is a constant need for qualified workers in various specialties.

Today, there is a large selection of vacancies, and you can apply for the one that matches your education and work experience. The most current vacancies: managers, IT specialists, financial and economic specialists, chemical analysis laboratory assistants, engineers in various fields of work, process plant operators.

Yamal LNG – vacancies for specialists of various specialties. The main advantages that allow the company to successfully compete in the modern market:

  • deposits are located on land and are highly concentrated;
  • development technologies are well developed;
  • studied geology;
  • a minimum of funds is spent on field development and gas production;
  • climatic conditions make it possible to effectively carry out the liquefaction process;
  • established market in Europe and the Asia-Pacific region;
  • tax breaks and other government support.

Many vacancies require people with experience in similar work, but there are also those who accept people without work experience, for example, general workers, drivers of various categories of driving, and there are vacancies for women.

Jobs in gas production in Yamal

It is planned to extract gas from 208 wells; it will be supplied to the market in liquefied form, therefore, starting in 2017, three technological lines will be commissioned, each with a capacity of 5.5 million tons of liquefied gas per year.

A shipping rack with two berths is being installed in the port of Sabetta. Now the cargo berths are already operational, so the delivery of building materials is carried out continuously throughout the year. This project involves the construction of the largest LNG production plant in Russia.

This is the largest enterprise on the Yamal Peninsula, which provides people in this region with highly paid jobs, the average salary is 120,000 rubles. Yamal LNG – vacancies for rotational work. Usually the shifts are 30/15, 30/30, 60/30, but there may be others, so when applying for a job, be prepared to temporarily leave your family, your usual life and work in harsh climatic conditions.

Since the construction of the plant is planned until 2019, the need for new specialists will remain relevant for a long time.

Shift in Sabetta with accommodation

The stronghold of Yamal LNG is the village of Sabetta, which has created comfortable conditions for living, rest and leisure of workers. There are cozy dining rooms, a hotel, a bathhouse, a sports complex, food warehouses and other facilities. The infrastructure is constantly expanding, a laundry room, living quarters, a warm parking lot, and a new canteen are currently being built, so current vacancies are appearing. More than 15,000 people are already employed in the implementation of this project, and if you hurry, you can soon join them.

Feedback from employees about working in the North

The project involves the construction of a plant for the production of liquefied natural gas (LNG) on the resource base of the South Tambeyskoye field. The proven and probable gas reserves of the field according to PRMS standards amount to 926 billion cubic meters. m. As part of the Project, a transport infrastructure is being created, including a seaport and an international class airport in Sabetta.

Fresh selection of Yamal LNG vacancies for today

Welding engineer category 1

OJSC Yamal LNG
Sabetta (Yamalo-Nenets Autonomous Okrug)
Technical supervision, carrying out and coordinating work to determine compliance with the established requirements of the welding work performed and the object (welded structure) during construction...
…enterprises in the oil and gas, oil refining industries and/or LNG production enterprises. Knowledge of welding methods: RD, RAD. MP, MPG, AF, AAD.

Chemical engineer / Chemist engineer


Carrying out the full range of analyzes offered by the chemical analysis laboratory, including the distribution of tasks among laboratory staff. Preparing the laboratory for accreditation...
Higher education in chemistry and chemical technology. The following courses are preferred: chemistry course for the oil and gas industry, laboratory analysis courses...

Electrical engineer (category 1)/supervisor (energy supply area)

OJSC Yamal LNG Sabetta (Yamalo-Nenets Autonomous Okrug)
Control and supervision of compliance with current legislation, regulations, requirements of administrative and regulatory documents for the technical condition of electrical installations: PS...
Higher professional education (electricity / energy). Experience: at least 3 years of work in a similar position. English is fluent.

Leading Energy Engineer, Energy Supply Section

OJSC Yamal LNG
Sabetta (Yamalo-Nenets Autonomous Okrug)
Implementation of organizational and technical support for the full cycle or individual stages of operation of electrical installations: substation 35/10(6) kV, ZRU-10(6…
Higher professional education (electricity / energy). Experience in the specialty: at least 3 years of experience in a similar position.

IT trainee specialist (technical support)

OJSC Yamal LNG
Moscow, Vernadskogo Avenue and 2 more CAREER.RU
Assembling, installing and upgrading PCs. Diagnostics of hardware and software in order to detect faults. PC hardware repair by replacing faulty…
Knowledge of PC hardware and peripherals. Knowledge of Windows XP / Vista / 7 OS. Knowledge of basic network protocols and services.

Chemical analysis laboratory assistant

OJSC Yamal LNG
Sabetta (Yamalo-Nenets Autonomous Okrug)
Carrying out timely sampling in strict accordance with regulatory and technical documentation and sampling schedule. Conducting routine analysis of gas samples, gas…
Higher or secondary specialized education in the field of chemistry and chemical technology or secondary specialized education, possession of a 4th/5th laboratory technician certificate...

Wastewater treatment plant operator / chemical water treatment operator (water treatment plant, 3rd category)

OJSC Yamal LNG
Sabetta (Yamalo-Nenets Autonomous Okrug)
Carrying out start-up and shutdown of water treatment facilities, guided by the instructions of the senior control panel operator. Ensuring the safe operation of process equipment and pipelines.
Secondary specialized or higher education, preferably with a specialization in health and sciences. Availability of a qualification certificate for a wastewater treatment plant operator / wastewater treatment operator / operator…

Welding master

OJSC Yamal LNG
Sabetta (Yamalo-Nenets Autonomous Okrug)
Production of welded structures (products, products: metal structures, pipelines, equipment) in accordance with established quality requirements. Analysis of the plan/schedule for the production of welded…
Secondary vocational education. Experience in certification of welding equipment and technologies. Experience in managing a team (team) of welders when performing welding (construction, repair) responsible...

Leading specialist of the information systems support group (Sabetta, Yamal-Nenets Autonomous Okrug)

OJSC Yamal LNG
Sabetta (Yamalo-Nenets Autonomous Okrug)
Administration, optimization of the company’s information systems (EDS Directum, 1C, Drilling Monitoring, project management systems). Administration of DBMS MS SQL 2008…
Higher technical education. Practical experience: — Installation, configuration, administration, optimization of configurations based on 1C: Enterprise 8.2, 8.3…

MECHANICAL ASSEMBLY WORKER

responsibilities:

Execution of production tasks received from the mechanic repair shop foreman for equipment repair and post-repair testing;
Installation, configuration, diagnostics (troubleshooting), repair and maintenance of mechanical equipment (various types of pumps, valves, gate valves, etc.);
Providing daily reports on work performed, participating in safety meetings and informing the supervisor of any malfunctions or deviations;
Compliance with work permit requirements;
Assistance in preparing work permits;
Obtaining from the warehouse the spare parts necessary to perform the work;

requirements:

Secondary special education;
Having a Mechanical Assembly Mechanic certificate (minimum 3 categories) is required;
5 years of experience as a repair technician in a workshop and in the field at oil, gas and petrochemical industry enterprises;
Experience with systems for issuing work permits;
Skills in identifying the necessary spare parts for repair/restoration work and experience in drawing up and placing applications for them;
Required: experience in inspection and repair of shut-off and control valves (namely: ball and plug valves, gate valves, valves, spring and pulse safety valves (pilot), control valves, check valves, etc.);
Experience with mechanical and hydraulic systems;
Proven skills in using hand and special tools (centering, tightening, mounting and disassembling flange connections, working with pipelines and flexible pipes).

HEATING NETWORKS MAINTENANCE WORKER

The construction of the liquefied natural gas plant is carried out in three stages with the launch in 2017, 2019 and 2019, respectively. The project provides for the annual production of about 16.5 million tons of liquefied natural gas (LNG) and up to 1.2 million tons of gas condensate for supplies to the markets of the Asia-Pacific region and Europe.
The project is being implemented by Yamal LNG OJSC, whose shareholders are the largest companies in the field of production and processing of hydrocarbons: NOVATEK OJSC - 60%, Total - 20%, CNPC - 20%.

Personnel policy

OJSC Yamal LNG in its activities complies with high international standards in matters of social and personnel policy. Our project is being implemented by representatives of various nationalities and states. A common goal and a strong team are the main conditions for the successful implementation of the Project. The company creates comfortable and safe working conditions, takes care of the social security of employees, providing compensation, voluntary medical insurance, and the possibility of sanatorium-resort rehabilitation and recreation.

Fill out your resume ➤

OJSC "YAMAL LNG" is an actively developing company interested in cooperation with highly qualified specialists.

Job vacancies on Sabetta

Moscow (5)
MANAGER OF INVESTMENT PLANNING AND FINANCIAL ANALYSIS DEPARTMENT (DECRETARY RATE)
CHIEF SPECIALIST, INFORMATION TECHNOLOGY DEPARTMENT (MOSCOW)
ENGINEER OF 1 CATEGORY
HVAC Engineer
CHIEF SPECIALIST OF FINANCIAL AND ECONOMIC DEPARTMENT
Sabetta/LNG Plant (46)
________________________________________
DEPUTY HEAD OF CORROSION GROUP
HEAD OF COMMON FACILITIES SECTION
DEPUTY MANAGER OF ELECTRICAL EQUIPMENT GROUP FOR GENERAL FACILITIES, POWER PLANT, STORAGE AND SHIPPING OF FINISHED PRODUCTS
SENIOR ELECTRICAL ENGINEER (PROCESS LINES SECTION)
ENGINEER 1 CATEGORY (EQUIPMENT OVERHAUL GROUP)
Mechanical engineer 1st category (designer)
Senior Civil & Structural Engineer
EQUIPMENT MAINTENANCE AND PPR PLANNING ENGINEER
CONDITION MONITORING ENGINEER
REPAIR ENGINEER 1 CATEGORY PRODUCTION AND TECHNICAL DEPARTMENT
PROJECT ENGINEER 2 CATEGORY / JUNIOR PROJECT ENGINEER
CHEMICAL ENGINEER
ENGINEER 2 CATEGORY (JUNIOR SHUTDOWN ENGINEER)
TECHNOLOGIST ENGINEER 1 CATEGORY / PROCESS CONTROL TECHNOLOGIST
SENIOR ELECTRICAL ENGINEER (GENERAL PLANT FACILITIES)
ENGINEER-INSPECTOR 1 CATEGORY
ENGINEER-INSPECTOR 2 CATEGORY
ENGINEER 1 CATEGORY FOR DEVELOPMENT OF PROCEDURES FOR MAIN PRODUCTION SYSTEMS AND INSTALLATIONS OF THE TECHNOLOGICAL LINE SECTION
ENGINEER 1 CATEGORY HVAC ENGINEER
CONSTRUCTION ENGINEER
TECHNOLOGIST ENGINEER 2 CATEGORIES
PROJECT ENGINEER
TECHNOLOGICAL EQUIPMENT REPAIR MASTER
ENGINEER FOR GENERAL CONSTRUCTION WORKS AND STRUCTURES
OPERATOR OF TECHNOLOGICAL INSTALLATIONS 7 DISCHARGE LNG PLANT PROCESS LINES SECTION
Head of estimate and contract department / Head of project service & control
CHEMICAL ANALYSIS LABORATORIST 4-5 CLASS
ENGINEER 2 CATEGORY (VIBRATION MONITORING AND CONTROL GROUP) / JR. CONDITION MONITORING ENGINEER
OPERATOR OF TECHNOLOGICAL INSTALLATIONS (CENTRAL CONTROL PANEL) OF THE ENTRANCE STRUCTURES SITE
HEAD OF METROLOGIST GROUP
CATEGORY 1 NDT ENGINEER / NDT ENGINEER
CATEGORY 1 ENGINEER IN PRODUCTION PLANNING
DEPUTY PROJECT ENGINEERING MANAGER
TECHNICAL ASSISTANT
SENIOR INSTRUMENT ENGINEER
Operational readiness engineer / OR&A engineer
CONTROL SYSTEM AND DIAGNOSTICS EQUIPMENT TECHNICAL CONDITION ENGINEER
CORROSION ENGINEER 2 CATEGORY
OPERATOR OF TECHNOLOGICAL INSTALLATIONS 8 DIAGRAM LNG PLANT, PROCESS LINES SECTION
ELECTRICAL ENGINEER 1 CATEGORY
HEAD OF METROLOGY LABORATORY, DEPARTMENT OF ICS AND INSTRUMENTATION
Pre-Project Preparation Project Engineer / Front End Project Engineer
SENIOR LABORATORIST CHEMICAL ANALYSIS
ENGINEER 2 CATEGORY (ROTING EQUIPMENT) / JR. ROTATING EQUIPMENT SPECIALIST
ENGINEER 1 CATEGORY (OR&A ENGINEER)
Sabetta - .
________________________________________
SPECIALIST OF THE TECHNICAL DOCUMENTATION CONTROL DEPARTMENT (SHIFT 30/30)
TRANSLATOR
HEAD OF ENVIRONMENTAL PROTECTION SERVICE
CHIEF SPECIALIST OF INFORMATION SECURITY DEPARTMENT (SABETTA)
DEPUTY HEAD OF ENVIRONMENTAL PROTECTION SERVICE
Electrician 3-4 categories
Locksmith - machine operator

Yamal LNG is an integrated project for the production, liquefaction and sale of gas
Competitive advantages
traditional reserves of high concentration located on land
well-studied geology and proven development technologies
very low development and production costs
High efficiency of the liquefaction process due to low average annual temperature
access to markets in Europe and the Asia-Pacific region
government support, including tax benefits

Project infrastructure

The field development project involves drilling 208 wells at 19 well pads. Gas produced at the field will be supplied to the international market in the form of LNG, for which a gas liquefaction plant will be built, consisting of three technological lines with a capacity of 5.5 million tons of LNG per year each. The infrastructure for loading LNG for export will consist of a loading rack with two berths in the port of Sabetta, equipped with ice protection structures. Reinforced ice class Arc7 tankers will be used to transport LNG.

Project implementation status

The final investment decision on the project was made in December 2013, and the start of LNG production is planned for 2017.
Major tenders have been completed and key contracts have been concluded for the supply of materials and equipment and the provision of design and construction services. More than 95% of the LNG plant's products have been contracted. The operation of cargo berths in the port of Sabetta has begun, ensuring year-round delivery of construction cargo. Development drilling and construction and installation work are underway at the LNG plant facilities. At the end of 2016, the project was approximately 75% complete.

As part of the YAMAL LNG project, it is planned to build the country's largest LNG (liquefied natural gas) processing and production plant, capable of developing a capacity of about 16,500,000 tons annually based on the resources of the South Tambeyskoye field.
According to PRMS standards, the proven and probable reserves of the gas field are approximately 900 billion cubic meters. This project involves the implementation of communication routes:
sea ​​port,
motor transport structure,
modern Sabetta airport.

Work at Yamal LNG

The company OJSC Yamal LNG is one of the leading companies in the region on the Yamal Peninsula, located beyond the Arctic Circle. This venture is a joint venture, where the management stake belongs to OJSC NOVATEK, TOTAL, CNPC and the Silk Road Fund are involved.
Salaries in Yamal LNG start from 120,000 rubles.

This structure involves a large number of jobs for. This direction is widely in demand among job seekers who are ready to break away from their usual life and move into hard work conditions for a period of one month or more. The shift schedule is mainly structured as follows: 30/15, 30/30, 60/30 - however, there are other options.
Working conditions
Construction of the plant is planned in three stages:
2017
2019
2019
Accordingly, current vacancies in the project will appear for a long time. Direct employers are ready to offer the best conditions for shift work in the gas production industry.
The Yamal LNG plant is being established above the Arctic Circle on the northern Yamal Peninsula, on the site of the South Tambey natural gas field. Construction is successfully carried out in 3 stages in 2017, 2019 and 2019. The natural gas processing project plans to annually produce 16.5 million tons of liquefied gas and up to 1.2 million tons of gas condensate for the Asia-Pacific and European markets. Job openings at the Yamal LNG plant will be available below.

Yamal LNG - Job search on a rotational basis: latest vacancies

Today, the rotational method is becoming more and more attractive for many job seekers due to the high salaries offered and trips to different regions of the country. Thus, vacancies at Yamal LNG are of interest to many specialists due to the opportunity to consistently receive a good salary, new experience and build a successful career.

To get acquainted with such job offers, it is proposed to take advantage of the extensive opportunities available to users on the World Wide Web on a website dedicated to employment. Lots of new ads are constantly being added here. Each of them indicates basic information on a specific specialty that interests applicants. It makes it clear how suitable the offer is for the specialist in terms of salary, region of work, responsibilities and other aspects.
Yamal LNG Company

Yamal LNG is a gas production company. The project is aimed at the active construction of a plant intended for the production of natural liquefied gas. Within its framework, it is planned to create the necessary facilities.

The project includes the following areas for natural gas:

  1. mining;
  2. liquefaction;
  3. supplies.

The advantages include the presence of a good resource base, as well as a good location, which in combination allows you to achieve excellent results.

This is also facilitated by the work of highly qualified employees who work in various specialties, applying directly in practice the entire volume of their professional knowledge and practical skills.

Current vacancies

On the Internet today it is easy to find many job offers for companies in the following areas:

  • operator of a gas station, wastewater treatment plant;
  • laboratory assistant;
  • fuel and lubricants storekeeper;
  • instrumentation mechanic;
  • translator;
  • geologist;
  • gas cutter;
  • Lead Engineer;
  • process engineer;
  • head of a workshop, department;
  • Instructor;
  • technician;
  • finisher;
  • economist;
  • insulator;
  • head of laboratory;
  • accountant;
  • truck crane operator;
  • chemical engineer;
  • installer;
  • foreman;
  • slinger;
  • driver;
  • mason;
  • driver;
  • Chief Specialist.

From this extensive list, it becomes clear that the company requires qualified employees in many specialties. Each vacancy job at Yamal LNG has its own list of requirements for candidates and professional responsibilities.

Working conditions

The offered vacancies are of interest to job seekers due to attractive conditions. Thus, employees are provided with everything necessary and are officially registered in accordance with all relevant labor legislation.

The advantages include the offer of a high and stable salary for interesting work in a friendly team with the opportunity to gain experience, new knowledge, realize your full professional potential, as well as advanced training. Shift positions at Yamal LNG are distinguished by convenient work schedules, long vacations, and the opportunity to travel to the regions of the country.

LNG PLANT IN YAMAL

An LNG plant with a capacity of approximately 16.5 million tons is being built directly at the South Tambey gas field, on the Gulf of Ob. The construction involves a modular type of installation, which seriously reduces the financial costs of construction and determines the project implementation schedule. This project will contain 3 natural gas liquefaction trains with a capacity of 5.5 million tons each year. The first launch is planned for 2017. Taking into account the low average Arctic temperatures, much less specific energy is required for the gas liquefaction process, this makes it possible to achieve large volumes of LNG production compared to projects located in the South and using similar equipment. After the plant starts up hydrocarbon production the mixture from the field's wells will be transported through gas collection networks to a single complex for gas preparation and liquefaction. Next, at the entrance of the complex there will be a separation process. The input structures include installations that regenerate methanol and stabilize condensate. The separated natural gas will go to technological lines where liquefaction and purification from acid gases and methanol will take place, as well as drying and removal of mercury, extraction of ethane, propane and other heavy hydrocarbons. Next, the purified natural gas will be sent for cooling and liquefaction. The LNG will be further stored in closed isothermal tanks. It is planned to build 4 reservoirs with a capacity of 160,000 cubic meters. m. each. Jobs at the LNG plant IN YAMAL vacancies - read on.

SABETTA VILLAGE - FOR WORKERS' ACCOMMODATION

The village of Sabetta, located on the eastern side of the Yamal Peninsula, is the stronghold of Yamal LNG. A modern infrastructure has been created here for comfortable living of workers, additional life support complexes have been built: a warehouse for fuels and lubricants, food storage warehouses, a reliable boiler room, cozy canteens, a medical center, a hotel, a public bathhouse, a sports complex, sewerage and water treatment facilities. Another canteen, a fire station, a laundry, a warm parking lot, and additional residential buildings for construction workers are being built. At the construction stage of the Project, the number of employees is already about 15,000 people. Join us too.

Open vacancies for Yamal LNG shift:

Locksmiths of various categories (3-6);
engineers of all categories;
machinists;
inspection engineers;
techniques of all directions;
specialists in entrance structures;
locksmiths of different qualifications and levels.

In addition, vacancies are often open that do not require work experience, vacancies for general workers, drivers. There are also vacancies for women on the project.
It should be noted that OJSC "YAMAL LNG" is one of the most attractive employers in the industry; international standards in social and personnel policies allow the company to offer the best working conditions on the market. A wide range of specialists from different countries are involved in the construction of the plant. A common goal and a united team are the main components for the successful completion of a project.

Specialists on a rotational basis are offered:
1. social security;
2. various compensations (accommodation, food);
3. VHI;
4. vouchers to sanatoriums and resorts to recuperate, etc.

Urgent work on a rotational basis: .

Fill out your resume ➤

Interesting VIDEO film about Yamal:

Vacancies at Yamal LNG. Shift work on Sabetta

5 (100%), Ratings: 51

Related publications